Step 34 of 35 · stage 8, building permission in dholera sir
Building use permission
Every person, unit or developer in the SIR must obtain DSIRDA approval after completion and before use of the premises. Without BU the building cannot lawfully be occupied.
- Official wording
- Obtain Building Use (BU) / occupancy permission from DSIRDA
- Where you go
- DSIRDA and the Apex Authority
- Online or in person
- Offline
- What it costs
- A scrutiny fee is required - the checklist has a line for the fee amount deposited with a...
- How long
- No timing stated
- Record id
- SIR-DEV-02, step 34 of 35
Where you go, and how
Dholera Special Investment Regional Development Authority (DSIRDA)
Mode: Offline
This office handles 4 of the 35 steps in the register. What else it does, and what it charges.
What to have with you
The source names 16 things the office asks for. Take them all in one go and the visit is usually one visit.
- True copy of the previously approved lay-out, the approved building plan and the development permission
- 7/12 extract
- Undertaking bond forms 2(a), 2(b), 2(c) and 2(d)
- Proof of registration of the professionals on record: C.O.W., S.D., architect/engineer and developer
- Working drawing signed and stamped by the registered engineer / architect
- Structural drawing signed and stamped by the registered structural engineer
- Sewer charge paid or payable where the site falls in a TP scheme
- Lift use licence
- Fire NOC
- Airport NOC
- Environment clearance
- Site photographs
- Completion plan consistent with the site condition, the earlier approval and the GDCR
- Revised non-agricultural order for the land where required
- Structural stability certificate from the structural engineer
- Five-year insurance for the construction
Quoted from the prerequisite list in the register. Where the source names a detail rather than a document, such as a survey number, it is listed as the source words it.
The form you fill in
Completion form / prescribed application form, assessed against the DSIRDA BU scrutiny checklist published at 'Checklist - For BU'
What it costs
Quoted from the government source, in its own words:
A scrutiny fee is required - the checklist has a line for the fee amount deposited with a receipt number and date - but THE AMOUNT IS BLANK on the published form.
No part of this figure has been rounded, converted or updated by us. If the department has revised it since 4 August 2026, the correction address is in the footer. Every published fee in the register sits on one page.
How long it takes
No timing stated. A department that does not publish a service standard cannot be held to one, which is worth knowing before you plan around a date.
No timeline is stated for this step in any source examined for this register. Where a statute prescribes a period it is recorded; where it does not, the value is left empty rather than filled with a turnaround time from an unofficial source.
What to watch out for
The register keeps a note against this step. It is the part most people find out too late, so it is printed in full rather than summarised.
Document list is translated from the Gujarati checklist; item numbering follows the published form.
The law behind it
Section 15(4)(b), Gujarat Special Investment Region Act, 2009; General Development Control Regulations of DSIRDA
Where this came from, and what comes next
Citation: doc_174.pdf pages 1-2 (the 24-item BU scrutiny checklist, read from the Gujarati text layer); GSIR Act 2009 page 17: 'Every person, unit or Developer or any other stakeholder in Special Investment Region shall be required to get the plans of the building approved by the Regional Development Authority before commencing any construction and shall obtain the approval of the Regional Development Authority necessary and incidental thereto, after the completion and before the use of such premises.'
Government page: https://dholera.gujarat.gov.in/for-bu/43
Value date: GSIR Act 2009; checklist as published on dholera.gujarat.gov.in, captured 2026-08-04
Local file read: doc_174.pdf (2-page DSIRDA BU scrutiny checklist)
Last verified: 4 August 2026
- The step before: 33. DSIRDA development permission
- The step after: 35. Single window for a new unit
- This stage: Permission to build inside Dholera SIR
- All 35 steps in one table